Lift Installation - Den Court, Fife

Consult Lifts quoted and were successful in being awarded the contract for the installation of a 2 stop 800kg Lift in the Den Court Sheltered Housing for Fife Council.

The works involved were the design supply and install of a new suitable lift with particular finishes and challenges to overcome with complying with EN81-20 standard to suit the existing building roof height.

New Equipment Installed:

• Kleemann ATLAS Traction 2 stop MRL – Complete Package • LISA 20 Controller System
• Ziehl Abegg Machine with VVVF Drive • Classic Athena Cabin
• “Future Trend” Fixtures  

Lift Installation

Lift Installation

Lift Installation

Lift Installation

Lift Installation

Lift Installation

Lift Installation

Lift Installation

Contact Consult Lifts

If you are interested in any of our Lift Solutions, Lift refurbishment or Lift Maintenance then please contact us.

Consult Lift Services
Thistle House
Inchinnan Road
Paisley
PA3 2RE
Scotland.

 0141 849 7211
 enquiries@consultlifts.co.uk